{"id":305,"date":"2019-08-15T11:00:01","date_gmt":"2019-08-15T05:30:01","guid":{"rendered":"https:\/\/www.teslacad.co.uk\/blog\/?p=305"},"modified":"2019-08-15T11:00:01","modified_gmt":"2019-08-15T05:30:01","slug":"the-growing-significance-for-bim-360-and-its-uses","status":"publish","type":"post","link":"https:\/\/www.teslacad.co.uk\/blog\/the-growing-significance-for-bim-360-and-its-uses\/","title":{"rendered":"The growing significance for BIM 360 and its uses"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Traditionally\nbuilding designs was largely reliant upon two-dimensional technical drawings\nwhich made it a costly, cumbersome and tedious affair. However, with the\nintroduction of the concept Building Information Modelling, the life of construction professionals has become\neasy. &nbsp;BIM\nincludes creating drawings and models along with light analysis such as\ndisplaying the properties of components used, quantities, geographic\ninformation etc. It can be thus called a concept or a technology useful for construction\nmanagement professionals which connects,\norganize and optimizes the project.&nbsp; <\/p><p class=\"wp-block-paragraph\">BIM 360 is a platform where the users can share and access\nproject data in real-time. Users from\nanywhere in the globe can collaborate with other users at any point any time in\nthe cloud. Since there is always a second thought about the safety and privacy\nof the data on the cloud, BIM 360 has\nmade it a point to make the data in the software highly secured. This software\ncan be used for small, medium and large scale construction and designing\npurpose. It is supported by windows, android and iOS formats.<\/p><p class=\"wp-block-paragraph\"><strong>Advantages\nfor using BIM 360:<\/strong><\/p><p class=\"wp-block-paragraph\">BIM 360 has a user-friendly\ninterface which allows the professionals involved in a project to enable a\nvirtual information model to be handed from\nthe design team to the main contractor and then to the owner\/operator. Professionals at each stage have the ability to add discipline-specific\ndata to the single shared model. This helps in the reduction of information loss which used to be a major issue before\nthe invent of BIM 360. <\/p><p class=\"wp-block-paragraph\">BIM 360 has additional features where it can\npredict hazards and proactively manage its quality. BIM\n360 provides unlimited storage for 3D and 2D project information. It\ncentralizes the project data making it available whenever you need. <\/p><p class=\"wp-block-paragraph\">It\nbroadens this concept beyond (3D), where supplementing the measurements like\nwidth, height and depth with scheduling is the fourth dimension (4D) and the cost is the fifth dimension (5D). <\/p><p class=\"wp-block-paragraph\">All\nthe more there are likewise references to a sixth dimension (6D) which\nrepresents environmental and sustainability analysis and seventh dimension (7D)\nwhich represents life cycle facility management aspect. <\/p><p class=\"wp-block-paragraph\">Usually, for on-field professional&rsquo;s mobile versions are\navailable so data can be accessed and worked on with the help of a mobile\ndevice. Data once synced is accessible offline. Unlimited projects can be\nmanaged in one single account. BIM 360 can store unlimited project data in one\nsingle account. One can enable to share their work with multidisciplinary teams\nwhere each one can get updates of the changes done, manage designs throughout\nthe lifecycle of the project. BIM 360 has added advantages of reducing risk,\nimproving quality and deliver projects in time and budget. It boosts the pace\nof decision making because BIM 360 can predict project outcomes. It also helps\nyou stay on schedule and control cost since any rework which is required can be\nimplemented then and there. <\/p><p class=\"wp-block-paragraph\"><strong>Approach to put BIM 360 to use:<\/strong><\/p><p class=\"wp-block-paragraph\">BIM 360 can be\nused for multiple purposes such as model comparison, document control and\nmanagement, design review etc. The procedures to work on these following is\nmentioned below in points.<\/p><ol class=\"wp-block-list\">\n<li><strong>Model Comparison<\/strong><\/li>\n<\/ol><p class=\"wp-block-paragraph\">Procedure for model comparison <\/p><ul class=\"wp-block-list\">\n<li>After\nopening BIM 360 software, upload versions of the 3D model or PDF file that you\nwant to compare by clicking on the Upload button.<\/li>\n\n\n\n<li>Select\nthe Revit option present in the leftmost panel for accessing 3D models whereas\nfor 2D files, select the PDF option.<\/li>\n<\/ul><figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/www.teslacad.co.uk\/blog\/wp-content\/uploads\/2019\/08\/01.webp\" alt=\"Model Comparison\" class=\"wp-image-306\" title=\"Model Comparison\"><\/figure><ul class=\"wp-block-list\">\n<li>Upon\nselecting the Revit option, the uploaded 3D models will appear.<\/li>\n<\/ul><figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/www.teslacad.co.uk\/blog\/wp-content\/uploads\/2019\/08\/02.webp\" alt=\"Model Comparison\" class=\"wp-image-307\" title=\"Model Comparison\"><\/figure><ul class=\"wp-block-list\">\n<li>Select\none of the two versions that you wish to compare.<\/li>\n\n\n\n<li>After\nselecting the model, the entire model will be visible.<\/li>\n\n\n\n<li>Click\non compare.<\/li>\n<\/ul><figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/www.teslacad.co.uk\/blog\/wp-content\/uploads\/2019\/08\/03.webp\" alt=\"Model Comparison\" class=\"wp-image-308\" title=\"Model Comparison\"><\/figure><ul class=\"wp-block-list\">\n<li>After selecting compare option, select the appropriate versions of both the models\nthat you want to compare and click on Compare.<\/li>\n<\/ul><figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/www.teslacad.co.uk\/blog\/wp-content\/uploads\/2019\/08\/04.webp\" alt=\"Model Comparison\" class=\"wp-image-309\" title=\"Model Comparison\"><\/figure><ul class=\"wp-block-list\">\n<li>As per user\ndefined graphics, changes are visible as shown below &ndash;<\/li>\n<\/ul><p class=\"wp-block-paragraph\">Elements added &ndash; Green colour<\/p><p class=\"wp-block-paragraph\">Elements modified &ndash; Yellow colour<\/p><p class=\"wp-block-paragraph\">Elements deleted &ndash; Red colour<\/p><figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/www.teslacad.co.uk\/blog\/wp-content\/uploads\/2019\/08\/05.webp\" alt=\"Model Comparison\" class=\"wp-image-310\" title=\"Model Comparison\"><\/figure><ul class=\"wp-block-list\">\n<li><strong>Document Control and Management <\/strong><\/li>\n<\/ul><ul class=\"wp-block-list\">\n<li>Users\ncan access the data in the cloud if they\nhave the appropriate credentials, this way we can monitor the users who can\naccess the data.<\/li>\n\n\n\n<li>One\ncan find all the project documents such as 2D plans, 3D models etc. at one\nplace.<\/li>\n\n\n\n<li>The\ndocument library has a separate folder\nstructure for 2D documents and 3D models.<\/li>\n<\/ul><figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/www.teslacad.co.uk\/blog\/wp-content\/uploads\/2019\/08\/06.webp\" alt=\"Document Control and Management\" class=\"wp-image-311\" title=\"Document Control and Management\"><\/figure><ul class=\"wp-block-list\">\n<li><strong>Design Review <\/strong><\/li>\n<\/ul><ul class=\"wp-block-list\">\n<li>One\ncan review the files on cloud, achieve\nany level of accuracy, and provide with mark-ups to the other user.<\/li>\n\n\n\n<li>The\npurpose of using BIM 360 for design review is to ensure that every drawing and\nmodel is accurate before construction begins.<\/li>\n<\/ul><figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/www.teslacad.co.uk\/blog\/wp-content\/uploads\/2019\/08\/07.webp\" alt=\"Document Control and Management\" class=\"wp-image-312\" title=\"Document Control and Management\"><\/figure><ul class=\"wp-block-list\">\n<li>Linear,\nangle and area measurements can be performed on drawings or models to\ncommunicate measurements via mark-ups.<\/li>\n\n\n\n<li>Shapes\nand mark-ups can be added in drawings and models to communicate effectively\nwith the team.<\/li>\n<\/ul><figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/www.teslacad.co.uk\/blog\/wp-content\/uploads\/2019\/08\/08.webp\" alt=\"Document Control and Management\" class=\"wp-image-313\" title=\"Document Control and Management\"><\/figure><p class=\"wp-block-paragraph\"><strong>Conclusion:<\/strong><\/p><p class=\"wp-block-paragraph\">Construction professionals have the burden and pressure to deliver successful projects irrespective of strict spending plans, limited manpower, accelerated schedules and limited or conflicting information. They have to make sure that the architectural, structural and MEP designs have to be well-coordinated as two things cannot occur at a similar spot and time. <strong><a href=\"https:\/\/www.teslacad.co.uk\/bim-services.php\" title=\"Bim Services\">BIM Services<\/a><\/strong> can moreover help in <strong>BIM Coordination<\/strong> and <strong><a href=\"https:\/\/www.teslacad.co.uk\/clash-detection-services.php\" title=\"Clash Detection Services\">Clash Detection Services<\/a><\/strong>, recognizing the definite area of inconsistencies. BIM 360 can thus be seen as an effective and useful software for the smooth workflow and management of construction projects aiding the construction professionals to deliver successful projects.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Traditionally building designs was largely reliant upon two-dimensional technical drawings which made it a costly, cumbersome and tedious affair. However, with the introduction of the concept Building Information Modelling, the life of construction professionals has become easy. &nbsp;BIM includes creating drawings and models along with light analysis such as displaying the properties of components used, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":314,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"featured_image_2":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-305","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/www.teslacad.co.uk\/blog\/wp-json\/wp\/v2\/posts\/305","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.teslacad.co.uk\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.teslacad.co.uk\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.teslacad.co.uk\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.teslacad.co.uk\/blog\/wp-json\/wp\/v2\/comments?post=305"}],"version-history":[{"count":0,"href":"https:\/\/www.teslacad.co.uk\/blog\/wp-json\/wp\/v2\/posts\/305\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.teslacad.co.uk\/blog\/wp-json\/wp\/v2\/media\/314"}],"wp:attachment":[{"href":"https:\/\/www.teslacad.co.uk\/blog\/wp-json\/wp\/v2\/media?parent=305"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.teslacad.co.uk\/blog\/wp-json\/wp\/v2\/categories?post=305"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.teslacad.co.uk\/blog\/wp-json\/wp\/v2\/tags?post=305"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}