{"id":465,"date":"2019-11-22T18:15:51","date_gmt":"2019-11-22T12:45:51","guid":{"rendered":"https:\/\/www.teslacad.co.uk\/blog\/?p=465"},"modified":"2019-11-22T18:15:51","modified_gmt":"2019-11-22T12:45:51","slug":"how-is-bim-useful-to-mitigate-construction-project-risk-and-complications","status":"publish","type":"post","link":"https:\/\/www.teslacad.co.uk\/blog\/how-is-bim-useful-to-mitigate-construction-project-risk-and-complications\/","title":{"rendered":"How is BIM useful to mitigate construction project risk and complications?"},"content":{"rendered":"<p class=\"wp-block-paragraph\"><strong>Overview<\/strong><\/p><p class=\"wp-block-paragraph\">Construction Industry is more prone to get fatal accidents and shortage of labor. Let us find how and why is the myth so true. In the world of digital technologies, there are many industries or business sector which have seen a drastic transformation in their business model and one of them is the construction industry. <\/p><p class=\"wp-block-paragraph\">Digital technologies have helped to maintain worker&rsquo;s safety on-site and mitigate project risk. While, the scenario in the late 1990s was theatrical as the traditional construction process was time-consuming, hazardous and human potential was not upgraded.<\/p><p class=\"wp-block-paragraph\">This\nbrought major setbacks into the construction industry by project delays and\nshortage of human labor. There is the highest rate of fatal accidents on the\nconstruction site. A construction site is quite risky due to which the workers\nneed to carry their work on heights, carry heavy equipment or heavy tools and\noften work under extreme noise pollution conditions that put them in higher\nrisk. Many construction companies aim to control and manage risks by time.<\/p><p class=\"wp-block-paragraph\">Choosing\nthe best construction software can help to manage significant risks incurred in\nthe project. With the on-going conditions of increased costs, new technology\nand industry trends, complex processes and increased safety concern have made\nrisk management plan more crucial than ever.<\/p><p class=\"wp-block-paragraph\"><strong>Sources\nof Construction Risk Management<\/strong><\/p><p class=\"wp-block-paragraph\">Construction\nRisk Management is the process of identifying risk associated with the project\nand ways to mitigate risks to minimize their impact on the project. The factor\nstated below are the risks which need to be documented and managed during the\nplanning stage.<\/p><p class=\"wp-block-paragraph\"><strong>Safety Risk: &ndash;&nbsp;<\/strong>The construction industry is most prone to have fatal accidents on-site that can lead to loss of human life. So careful planning must be held during the pre-construction stage to reduce labor shortage and any delay caused in the project. There are many digital technologies and smart devices which can help the contractors to manage the safety of the workers. <\/p><p class=\"wp-block-paragraph\">GPS can help to track their activities and alarm the contractor of accidents beforehand.&nbsp;<a href=\"https:\/\/www.teslacad.co.uk\/clash-detection-services.php\" title=\"Clash Detection Services\"><strong>BIM Clash Detection Services<\/strong><\/a>&nbsp;integrated into BIM Software used by the contractors or architects in modeling the construction process helps to identify threats and resolve them before the actual work begins on-site.<\/p><p class=\"wp-block-paragraph\"><strong>Financial\nRisk: &ndash;&nbsp;<\/strong>Financial issues in the construction industry arises\ndue to a loop in the planning process and coordination. If a project\nexperiences budget excess in small variation could not affect the managing\ncompany&rsquo;s future liquidity. But there is a risk that you would not be able to\npay the workers and might see the project in a standstill.<\/p><p class=\"wp-block-paragraph\"><strong>Environmental\nRisk: &ndash;&nbsp;<\/strong>Any natural calamities such as earthquakes, flood,\netc. can pose a risk to the construction sites and is not under control of\nanybody. All the natural issues must be tackled, managed and planned.<\/p><p class=\"wp-block-paragraph\"><strong>Design\nRisk: &ndash;&nbsp;<\/strong>Design Risk is a growing risk in the construction\nprocess and must be managed carefully to avoid any delay in the project. The\nproject team must manage the risk backed in the design stage during the\nconstruction process. This leads to delay in the designing of the project which\nmany contractors might suffer in the nearer future if not cured. In the\npre-construction planning phase, issues regarding design should be identified\nand solved.<\/p><p class=\"wp-block-paragraph\"><strong>Schedule Risk: &ndash;<\/strong>&nbsp;In the construction industry, what matters for a project to be successful is a time that the process takes in completion of a project and saves cost. But if poor scheduling is implemented it can create a devastating impact on the budget. <\/p><p class=\"wp-block-paragraph\">When the schedule is planned, any mistake occurs in the process can make the schedule go days or month&rsquo;s back which would rework and rebook contractors and create large cost overruns. Even a delay in the project can change the schedule of the project. When such situations arise, the project team should plan the process carefully and work together.<\/p><p class=\"wp-block-paragraph\"><strong>How\ncan BIM help to mitigate the risks involved in the construction project?<\/strong><\/p><p class=\"wp-block-paragraph\">With the implementation of&nbsp;<a href=\"https:\/\/www.teslacad.co.uk\/bim-services.php\" title=\"Bim Services\"><strong>3D BIM Services<\/strong><\/a>, modeling the project with BIM can increase efficiency and productivity on a construction site to improve smooth productivity by workers. It helps the construction professionals including architects and engineers to use tools for effective planning and construct structures. <\/p><p class=\"wp-block-paragraph\">BIM is a digital representation of geometric characteristics of a structure or a building. BIM provides information about a facility forming decisions during the life-cycle that is defined as existing from conception to demolition.<\/p><p class=\"wp-block-paragraph\">BIM\nallows the supervisor and authority professionals to identify hazards, take\nmeasure or eliminate those risks. From BIM Model, we get information on energy\nanalysis, lightning support, building components and geographic locations to\ncreate a virtual model that helps to analyze the job site conditions.<\/p><p class=\"wp-block-paragraph\">In\nthe construction phase,&nbsp;<a href=\"https:\/\/www.teslacad.co.uk\/bim-services.php\" title=\"Bim Services\"><strong>BIM\nArchitectural Services<\/strong>&nbsp;<\/a>offers insight from the safety matters of a project.\nIt also stimulates hazard as it navigates the site giving the project team\nplenty of time to tackle the issues.<\/p><p class=\"wp-block-paragraph\"><strong>Conclusion&nbsp;<\/strong><\/p><p class=\"wp-block-paragraph\">Risk Management or Construction Risk is one of the crucial conditions which contractors and architects would go through in the lifecycle of the project. Taking a proactive approach to risk management can help to speed up the project and reduce rework chances. <\/p><p class=\"wp-block-paragraph\">Many of the digital technologies can be beneficial for the construction companies, out of which BIM is one of the growing technology which helps them to analyses threat occurring on-site and resolves them before the work begins.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>OverviewConstruction Industry is more prone to get fatal accidents and shortage of labor. Let us find how and why is the myth so true. In the world of digital technologies, there are many industries or business sector which have seen a drastic transformation in their business model and one of them is the construction industry. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":466,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"featured_image_2":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-465","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/www.teslacad.co.uk\/blog\/wp-json\/wp\/v2\/posts\/465","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.teslacad.co.uk\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.teslacad.co.uk\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.teslacad.co.uk\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.teslacad.co.uk\/blog\/wp-json\/wp\/v2\/comments?post=465"}],"version-history":[{"count":0,"href":"https:\/\/www.teslacad.co.uk\/blog\/wp-json\/wp\/v2\/posts\/465\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.teslacad.co.uk\/blog\/wp-json\/wp\/v2\/media\/466"}],"wp:attachment":[{"href":"https:\/\/www.teslacad.co.uk\/blog\/wp-json\/wp\/v2\/media?parent=465"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.teslacad.co.uk\/blog\/wp-json\/wp\/v2\/categories?post=465"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.teslacad.co.uk\/blog\/wp-json\/wp\/v2\/tags?post=465"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}