{"id":867,"date":"2021-08-09T18:35:02","date_gmt":"2021-08-09T13:05:02","guid":{"rendered":"https:\/\/www.teslacad.co.uk\/blog\/?p=867"},"modified":"2021-08-09T18:35:02","modified_gmt":"2021-08-09T13:05:02","slug":"importance-of-clash-detection-for-effective-building-construction","status":"publish","type":"post","link":"https:\/\/www.teslacad.co.uk\/blog\/importance-of-clash-detection-for-effective-building-construction\/","title":{"rendered":"Importance of Clash Detection for effective Building Construction"},"content":{"rendered":"<p class=\"wp-block-paragraph\">The construction of any building has various stakeholders involved at different stages of the project&rsquo;s lifecycle. There are structural engineers, MEP technicians, architects, designers, suppliers, manufacturers etc. all of whom need to work in coordination with each other to ensure that the building gets completed without any errors or issues. One of the most effective methods to ensure coordination and reduce onsite errors is through timely <a href=\"https:\/\/www.teslacad.co.uk\/clash-detection-services.php\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\"Clash Detection Service (opens in a new tab)\" title=\"Clash Detection Services\">Clash Detection Service<\/a><a href=\"https:\/\/www.teslacad.co.uk\/clash-detection-services.php\" title=\"Clash Detection Services\">s<\/a>. In the building information model clash detection is the process of identifying any inter or intra disciplinary clash within the 3D Model. It has various advantages like saves time, resources, reduces loss of money and resources. In the current article we will be looking at the types of clashes that can occur in the construction process and also stating the advantages of detecting them in the preconstruction stage. <\/p><p class=\"wp-block-paragraph\"><strong>What are the types of clashes? <\/strong><\/p><p class=\"wp-block-paragraph\">There are three types of clashes that occur\nduring the construction process. <\/p><p class=\"wp-block-paragraph\">Hard Clash: Firstly, there is the hard\nclash which involves geometrical issues. Hard clash occurs when two objects are\noccupying the same space. It could be an intra disciplinary clash for\ninstance&nbsp; when a HVAC duct is clashing\nwith a plumbing pipe, or it could be an inter disciplinary clash, for instance\nwhen a steel beam is at the same place where a wall is (clash between\narchitectural and structural elements). Another rarer type of hard clash is\nconcerned with duplicates. It occurs when during the modeling phase the professional\nputs the same object twice in the same page. It is ideally detected and\nhighlighted. <\/p><p class=\"wp-block-paragraph\">Soft Clash: Soft clash occurs whenever an object or an element is not given the geometric tolerances that it requires. To put it simply whenever the buffer zone of any object is breached then a soft clash is detected. Undetected soft clashes could cause serious problems during the maintenance of objects. For instance, in <a href=\"https:\/\/www.teslacad.co.uk\/mep-bim-services.php\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\"MEP BIM Services (opens in a new tab)\" title=\"Mep Bim Services\">MEP BIM Services<\/a>, if any air-conditioning unit or heater is not given the proper buffer space then it could be difficult to properly maintain them as well as the heat radiating off it could cause harm to the near by components. <\/p><p class=\"wp-block-paragraph\">Workflow Clash: The last clash is with\nregards to scheduling and can also be called as 4D clash. This occurs when\nthere are any issues in the timeline. Workflow clashes are crucial and need to\nbe detected or else one small error could have a domino effect and disrupt the\nwhole timeline. <\/p><p class=\"wp-block-paragraph\"><strong>Why is Clash Detection so crucial? <\/strong><\/p><p class=\"wp-block-paragraph\">Clash Detection is not a novel process.\nBefore it used to take place onsite but with BIM it can take place in the\npreconstruction phase well before the onsite construction commences. BIM\nprovides architects, engineers, designers etc. the ability to identify clashes\nduring the planning and design stages, and eliminates the need for multi-level\ndesign changes that would result in overall reduction of cost and time. <\/p><p class=\"wp-block-paragraph\">Today, a lot of building components are\nprefabricated. It is necessary to ensure that the shop drawings are extracted\nfrom a clash-free BIM model because any changes in the dimensions or designs\nwould ultimately lead to the component having to be fabricated again. In\ntoday&rsquo;s construction scenario when companies are already working on razor thin\nmargins and tight timelines even a small error could make a huge difference. <\/p><p class=\"wp-block-paragraph\">When the construction industry has all the\ntools necessary to detect any hard, soft or workflow clashes in the\npreconstruction stage then they must utilize it and make the best out of it. <\/p>\n","protected":false},"excerpt":{"rendered":"<p>The construction of any building has various stakeholders involved at different stages of the project&rsquo;s lifecycle. There are structural engineers, MEP technicians, architects, designers, suppliers, manufacturers etc. all of whom need to work in coordination with each other to ensure that the building gets completed without any errors or issues. One of the most effective [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":868,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"featured_image_2":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-867","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/www.teslacad.co.uk\/blog\/wp-json\/wp\/v2\/posts\/867","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.teslacad.co.uk\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.teslacad.co.uk\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.teslacad.co.uk\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.teslacad.co.uk\/blog\/wp-json\/wp\/v2\/comments?post=867"}],"version-history":[{"count":0,"href":"https:\/\/www.teslacad.co.uk\/blog\/wp-json\/wp\/v2\/posts\/867\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.teslacad.co.uk\/blog\/wp-json\/wp\/v2\/media\/868"}],"wp:attachment":[{"href":"https:\/\/www.teslacad.co.uk\/blog\/wp-json\/wp\/v2\/media?parent=867"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.teslacad.co.uk\/blog\/wp-json\/wp\/v2\/categories?post=867"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.teslacad.co.uk\/blog\/wp-json\/wp\/v2\/tags?post=867"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}