Clash Detection v/s Clash Avoidance. Are they same?

When you consider all the components that must meet up to finish a building project, it can challenge the most experienced draftsmen, architects, and designers. How could it be that plumbing doesn’t intrude with ventilation work? Or that pillars don’t crash through walls? Indeed, experienced professionals help, yet they depend on a Clash Detection Services which is a method for envisioning the project through a special eye to stay away from potential crashes or conflicts.
During the design phase, consider clash detection as having x-ray vision and having the option to investigate the inside of a building project with the goal that you can know what is happening in a 3D view. imagine that the different parts – structural and MEP (mechanical, electrical and plumbing), each had assigned colours to separate them in the building survey inside a 3D model using BIM (Building Information Model) software. It is vital to know about the difference between the clash detection and clash avoidance so as to remove clashes and conflicts totally in the design phase and construction phase making the process smooth and targets achievable.

Clash Detection v/s Clash Avoidance. Are they same?